Section 468.101. Completion of work — report — notice.  


Latest version.
  •   When the work to be done under a contract is completed to the satisfaction of the engineer in charge of construction, the engineer shall report and certify that the contract is completed to the board. Upon receipt of the report, the board shall set a day to consider the report and shall give notice of the time and purpose of the meeting by ordinary mail to the owners of the land on which the work was done, and to the owners of each tract of land or lot within the district by publication in a newspaper of general circulation in the county. The publication is not required to name the owners of any tract of land or lot within the district. The date for considering the report by the board shall be not less than ten days after the date of mailing, or publication, whichever is later.

    [S13, §1989-a9; C24, 27, 31, 35, 39, §7532; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §455.111]

    85 Acts, ch 163, §3

    ;

    86 Acts, ch 1099, §2

    ;

    89 Acts, ch 126, §2

    CS89, §468.101

    95 Acts, ch 47, §1