Section 572.12. Time of filing against railway.  


Latest version.
  •   Where a lien is claimed upon a railway, the subcontractor shall have ninety days from the last day of the month in which such labor was done or material furnished within which to file the claim therefor.

    [R60, §1851; C73, §2137; C97, §3092; C24, 27, 31, 35, 39, §10281; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §572.12]

    87 Acts, ch 79, §4